Control the Experience.
Show Systems International builds IMMERSE™ — enterprise show control for immersive environments, themed attractions, and touring productions.
REAL‑TIME CONTROL
Lighting, media, audio, and I/O coordinated through a unified runtime.
OPERATOR‑FIRST
Mission-control UI built by working entertainment technicians.
SCALABLE
Modular architecture across rooms/scenes, nodes, and networks.
Enterprise-grade show control
SSI builds IMMERSE™ — a modular hardware + software ecosystem designed for theme parks, touring productions, attractions, resorts, and immersive entertainment environments.
- IMMERSE Designer: visual show programming and system configuration
- IMMERSE Runtime: real-time execution engine for cues, events, and automation
- Remote OCC: monitoring and control interface for operators and technicians
Explore IMMERSE Request a consult
Why SSI
We design for reliability, redundancy, and fast deployment in real venues — not lab demos.
Touring‑grade
Built for load‑in/out realities, network discipline, and on‑site ops.
Integrated
Lighting, media, audio, GPIO, networking — one architecture.
Deliverable‑ready
Documentation, patch sheets, and commissioning workflows included.
What you can do
Typical IMMERSE deployments span multiple spaces, with local nodes and centralized monitoring.
- Trigger logic: sensors, buttons, RFID, and timed sequences
- Show playback: audio zones and point-source FX
- Media control: video cues and fades
- Lighting: cue stacks, chases, and effects
- Automation: relays, actuators, and safety interlocks
Note: SSI does not disclose proprietary internal build details to customers. We provide operational documentation and serviceable deployment specs.
Typical system scope
IMMERSE deployments are designed around rooms/scenes, each with defined triggers, effects, and reset behavior.
Rooms/Scenes
Up to 12 rooms/scenes per house (common deployment profile).
Node Density
Up to 12 nodes per type per room/scene (audio/video/GPIO/DMX gateways).
Documentation
Room packets, wiring tables, patch exports, and commissioning checklist.
Engagement model
SSI supports projects end‑to‑end — from initial scope to commissioning — while keeping internal implementation methods confidential. You get clear, serviceable deliverables and operator-ready results.
Discovery
Requirements capture, room/scene inventory, trigger/effect lists, and network constraints.
Design + Integration
System design package, integration plan, and testing strategy aligned to venue operations.
Commissioning
On-site validation, reset behavior verification, and operator training.
Deliverables you can hand to installers
We provide operational documentation and serviceable deployment specs — without disclosing proprietary internal build details.
Room packets
Per room/scene: triggers, effects, timing notes, and reset behavior.
Wiring + patch exports
Wiring tables, DMX/sACN patch summaries, media lists, and labeling conventions.
Commissioning checklist
Step-by-step verification flow for install teams and operators.
Support and lifecycle
Use the SSI Portal to access downloads, project resources, updates, and support uploads. Access is role-based for clients, integrators, and installers.
Controlled downloads
Software, firmware, templates, and project bundles with minimum access levels.
Support uploads
Submit logs/screenshots securely for faster issue resolution.
Analytics (optional)
Basic download activity signals for enterprise deployments.